October 29, 2026
The park work finishing around Woodbury this fall was decided years ago. The new trail and parking lot at La Lake Park, the work at Ojibway Park and the remodel starting at Colby Lake Park all come out of earlier plans, budgets and grant applications. The requests residents put on the record in 2026 are a different matter. They asked for a central gathering place, more room for teens and better access to a pool, and none of those has a project, a budget or a location yet.
That starts to change in the second week of November. The city's Parks and Facilities Long-Range Plan is moving out of its questionnaire phase and into setting priorities. Two community input sessions at Central Park in early November are where that ranking starts.
La Lake Park shows how long the gap between a plan and a finished park can be. Woodbury News Net reported that the La Lake Park Restoration and Development Project grew out of a 2022 planning study of the park's hardwood forests, large oaks and lakeside ecology. In November 2024 the City Council approved $1 million to buy a 3.2-acre shoreline parcel at 6895 Bailey Road. In May 2026 the state bonding bill matched the city's $2 million commitment with another $2 million, for a total project cost of $4 million. So four years passed between the study and the money arriving, and the north side of the park is still waiting on construction.
Here is where the city's current park projects stood as of the fall 2026 Parks and Natural Resources Commission meetings:
| Project | Status this fall |
|---|---|
| La Lake Park, south side | Trail and parking lot completed |
| Interlachen Parkway, Ojibway Park, Nature Path | Completed |
| Edgewater Park | In progress |
| M Health Fairview Sports Center | In progress |
| Colby Lake Park building | Remodel set to begin at the end of September |
| Shawnee Park, Colby Lake Park parking lot | In design |
| La Lake Park, north side | Public open house held Oct. 12; construction ahead |
The north side of La Lake will get a large open-air picnic shelter, permanent restrooms, picnic areas for big groups and gatherings across generations, and a paved entry drive, parking lot and trails. The Pioneer Press described the full renovation as taking several years. If a project with a 2022 study behind it is still being built in 2026, the requests that get ranked this November are the ones residents can expect to see built over the following decade.
Woodbury has run its citywide resident survey 17 times. This year's ran from Jan. 7 to Feb. 23, 2026, and drew 969 responses from a random sample of 5,000 households, plus 585 more through open participation. The survey firm told the council that the random-sample results carry a margin of error of plus or minus 3 percent.
At the May 13, 2026 City Council meeting, staff went through the themes in residents' open-ended comments. According to the minutes, residents generally rated Woodbury's quality of life, parks and city services highly. Some of the comments, though, pointed directly at the parks plan:
"Many comments pointed out that Woodbury functions well operationally but lacks a central or community gathering place."
The same minutes record that residents often asked for community gathering spaces and for more informal spaces and activities for older children and teens. They also raised concerns about "recreation facility demand, pool availability, aging infrastructure," and keeping parks and amenities maintained as the city grows.
Those comments are not findings from the parks plan. They came from the general city survey. They do give the November sessions a starting list, though, and the parks plan's own questionnaire asked about the same topics. It asked residents whether aquatics, teen and older-adult opportunities, dog parks, events and community gathering spaces were missing or falling short.
The pool comments come after a recent loss. The Woodbury High School pool, which the Star Tribune said had been home to the district's fastest swimmers for about 50 years, closed for good in March 2025 to make room for a larger kitchen and cafeteria. The pool at Woodbury Middle School had been shut for several years and was also closed permanently. The district told families that swim programs would not be cut. After the closures it had four pools: Lake Middle School in Woodbury, Oltman Middle School, Cottage Grove Middle School and the Community Pool in St. Paul Park.
For a Woodbury household that just wants to swim, the options today are:
The city does have one water project scheduled. Its May 2026 newsletter described a splash feature planned for the Carver Lake beach playground. That is a play feature, not a pool. No city pool or aquatic center has been proposed, and the long-range plan has not recommended anything yet. Aquatics is on the questionnaire as a category, and the listening sessions are where residents can say how high it should rank.
After a workshop on Sept. 24, 2025, the City Council directed staff to go ahead with the plan. It is meant to guide planning, improvements, management, budgeting and investment in Woodbury's parks and recreation for about 10 to 15 years. It will also shape the parks, recreation and open-space part of the city's 2050 Comprehensive Plan. The plan covers a large system. The city counts more than 3,600 acres of city-owned land and 180 miles of trails, along with athletic fields and courts, two indoor ice sheets, a fieldhouse, a golf course and a skate park.
The planning memo from October 2025 lists the questions the process is supposed to answer: which infrastructure needs updating, where facilities don't match how residents want to spend their time, whether other public or private providers already meet some of those needs, where demand exists for new or improved amenities, and which land the city should try to acquire first. The private-provider question matters most for the pool request, since the YMCA and Life Time already run indoor pools within city limits.
The consulting firm is ISG, Inc. The work happens in three phases:
The city expects to bring final recommendations to the City Council in summer or fall 2027. The resident focus group behind the first phase is described two ways in city documents. The May City Update counts 27 volunteers, while the May commission minutes count 27 community members plus 10 City Council appointees.
With the questionnaire closed, the November sessions are the next scheduled chance for residents to weigh in. The October 2026 City Update lists both, and residents can attend whichever one fits their schedule:
Both sessions are at Central Park, 8595 Central Park Place. Some community calendars list the Monday session from 6 to 7:30 p.m. The 6:30 to 8 p.m. time comes from the city's own newsletter, and woodburymn.gov/ParksPlanning has the latest details before you go.
The location makes sense for this topic. Central Park is the city's indoor park, and its amphitheater hosts free indoor concerts through the colder months. The St. Paul Police Band plays there on Nov. 29, and the Capri Big Band plays on Dec. 13. It is the kind of indoor gathering space residents said Woodbury needs more of, and the city will be asking at these sessions what should come next.
Anyone who wants to follow the plan after the sessions can sign up for its City InTouch email updates, which the city uses to post each step through the 2027 recommendations.
How close a home is to the trails, beaches and parks you actually use makes a real difference in daily life here. If you'd like to talk about what Woodbury's park plans could mean for your part of the city, Kami Gerald is happy to walk through it with you. Let's Connect.
Stay up to date on the latest real estate trends.
Whether buying your dream home, selling a luxury property, or exploring Minnesota’s finest communities, Kami provides expert guidance and personalized service designed around your goals.